Project List ( All Completed Projects)


Sr No. Nodal Agencies Funding Agencies Project Type Project Name Status Start Date End Date (%) Remarks
1 Ministry of Law and Justice
Uttar Pradesh
Ministry of Law & Order Building Projects 24 Court Building, District Court, Faizabad Completed 05-01-2013 05-09-2020 100 %

समस्त कार्य
पूर्ण।
 हस्तानांतरण
प्रपत्र इस
कार्यालय के
पत्रांक 1578 / कार्य-34
/117 दिनांक 22 /11 / 2021
द्वारा प्रेषित।
  

2 Uttar Pradesh Tourism Uttar Pradesh Tourism Building Projects Ayodhya Dham Bus Station (Phase 1) Completed 01-04-2018 31-03-2019 100 %

Phase 1 has been completed; phase 2 in planning
stage

3 Department of Urban
Development
Department of Urban
Development
Sewerage Plant Ayodhya Sewerage Reorganisation Plan (Ayodhya
City, Tehsil Sadar)
Completed 20-02-2014 30-11-2020 100 %

Testing & Commissioning in progress

4 Department of Urban
Development
Department of Urban
Development
Sewerage Plant Ayodhya Sewerage Scheme Phase-2 Completed 03-08-2019 12-07-2020 100 %

Testing and comissioning work is under
progress

5 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Barricading work for the visitors to visit Ayodhya
in a protective manner.
Completed 22-04-2024 05-04-2024 100 %
6 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 3)
Completed 23-03-2024 05-04-2024 100 %
7 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 4)
Completed 22-03-2024 05-04-2024 100 %
8 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part-2)
Completed 22-03-2024 05-04-2024 100 %
9 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Building Projects Beautification work in front of the airport gate
on Naka bypass.
Completed 24-12-2023 29-12-2023 100 %
10 Department of Housing and
Urban Planning
Department of Housing and
Urban Planning
Sewerage Plant CC road, drain and street light work in JB Puram
Colony.
Completed 15-03-2023 14-09-2024 100 %
11 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects CNC on the walls along the main roads of Ayodhya.
Making cut metal murals.
Completed 14-10-2023 29-11-2023 100 %
12 Dharmarth Karya Vibhag Uttar Pradesh Public Works
Department
Road Projects Construction from Panch Kosi Parikrama Marg Km-11
(Near to Rajghat Park) to Jhunki Ghat Road in
Ayodhya
Completed 11-08-2021 31-10-2021 100 %

work completed.

13 Rajya Krishi Utpadan Mandi
Parishad
Rajya Krishi Utpadan Mandi
Parishad
Building Projects Construction of 50 Rooms for 100 Students along
with a Toilet Block on the First Floor, Warden
Room with Attached Toilet in Acharya Narendra Deva
University of Agriculture and Technology.
Completed 24-09-2019 19-01-2021 100 %

Work Completed.

14 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain from
Abbusaray bypass to Heerala Yadav House upto
Railway Crossing
Completed 31-03-2022 30-06-2022 100 %

• कार्य पूर्ण

15 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain from
Gopalpur Sharda Sahayak Canal to Gopalpur Sampark
Marg
Completed 31-03-2022 30-06-2022 100 %

• work complete

16 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Gaanja Village from Puliya to Dharamshala
Completed 22-03-2022 21-06-2022 100 %

• कार्य पूर्ण

17 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Gopalpur from Mukhyamarg to Mathura Prasad House
Completed 31-03-2022 30-06-2022 100 %

• work complete

18 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Kaadipur from Kaadipur Chauraha to Bade Nahar Ki
Puliya
Completed 31-03-2022 30-06-2022 100 %

• work complete

19 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Kushmaha from Akbarpur Main Road to Rajendra
Prasad House
Completed 31-03-2022 30-06-2022 100 %

कार्य पूर्ण

20 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Makkhapur from Bypass to Primary School
Completed 23-03-2022 22-06-2022 100 %

• work complete

21 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Malikpur from Bade Nahar Ki Puliya to Handpump
Completed 31-03-2022 30-06-2022 100 %

कार्य पूर्ण

22 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Mirzapur Maafi from Panchayat Ghar to Chhedi Lal
Rawat House
Completed 23-03-2022 22-06-2022 100 %

• work complete

23 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Nandapur Village from Shri Vijay Yadav's Shop to
Shri R.N. Pandey's House
Completed 22-03-2022 21-06-2022 100 %

• स्थल पर
उपलब्धता के आधार
पर कार्य पूर्ण

24 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in Poore
Hussain Khan from Shri Asgar's Shop to Shri
Sanjay's House
Completed 31-03-2022 30-06-2022 100 %

work complete

25 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Ranopali from Bihari Ke Purwa Joganiya Parikrama
Marg to Shri Chand's House and Adjoining Gali
Completed 23-03-2022 22-06-2022 100 %

• work complete

26 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Shamshudeen Pur from Mirzapur Maafi Road to
Chandrika Yadav House
Completed 31-03-2022 30-06-2022 100 %

• कार्य पूर्ण

27 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of Bituminous Road and Drain in
Shamshudeen Pur from Primary School to Sainik
Poster Kids Pre School
Completed 31-03-2022 30-06-2022 100 %

कार्य पूर्ण

28 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of CC Road and Drain in Dharampur
Sahadat from Ram Surat House to Ram Ashish House
Completed 22-03-2022 21-06-2022 100 %

कार्य पूर्ण

29 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of CC Road and Drain in Kushmanaha
from Panchayat Ghar to Achari Ka Purwa Kali Mata
Main Road
Completed 31-03-2022 30-06-2022 100 %

• work complete

30 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of CC Road and Drain in Paliya
Sahbadi from Badi Nahar to Vijay Pandey House upto
Chhoti Nahar and Adjoining Gaalis
Completed 16-03-2022 15-06-2022 100 %

• work complete

31 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction of CC Road and Drain In Ranopali from
Maurya General Store to Ashish Kumar Srivastava
House
Completed 14-03-2022 13-06-2022 100 %

• work complete

32 Department of Urban
Development
Department of Urban
Development
Sewerage Plant Construction of Co-treatment Plant in Ayodhya
Nagar
Completed 18-11-2020 17-05-2021 100 %

• Work Completed

33 MSDP-Ministry of Minority
Affairs
MSDP-Ministry of Minority
Affairs
Building Projects Construction of Community Toilets in Faizabad
Acharya Narendra Deva ward, Dalmandi Ward,
Amaniganj Ward Area, Avadhpuri Ward, Pathan Tolia
Area, Jharkhandi Ward, Mangal Pandey Ward Area.
Completed 01-04-2019 01-03-2022 100 %

work completed.

34 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction Of Interlocking Road and Drain in
Ranaopali from Vaishnavi Nursing Home bypass to
Mahobra Bazaar and Adjoining Galiya
Completed 14-03-2022 13-06-2022 100 %

• work complete

35 Department of Urban
Development
Twarit Aarthik vikas yojna Road Projects Construction Of Interlocking Road and Drain in
Ranopali from Umesh kumar Verma house to Manendra
pratap Singh house to Ram Surat Gupta house
Completed 22-03-2022 21-06-2022 100 %

• work complete

36 State Youth Welfare Council,
Uttar Pradesh
State Youth Welfare Council,
Uttar Pradesh
Building Projects Construction of Mini Stadium in Kodai Kalan Gaon Completed 14-10-2019 31-10-2021 100 %

• work completed and inventory send on
18-2-2022

37 Department of Housing and
Urban Planning
Department of Housing and
Urban Planning
Building Projects Construction of Thirty Eight Numbers Mini MIG
Houses under Chief Minister Scheme
Completed 28-03-2021 27-03-2022 100 %

• Work for fifteen houses completed up to
finishing level and eleven houses till plinth
level

38 Department of Housing and
Urban Planning
Mela Mad Road Projects Construction work of a new access road for the
tent city to be built in Nav Ayodhya from the
national highway.
Completed 17-01-2024 27-01-2024 100 %
39 Uttar Pradesh Public Works
Department
Government of Uttar Pradesh Building Projects Construction work of computer room and seminar
hall in Government Polytechnic Ayodhya
Completed 13-04-2022 30-06-2023 100 %
40 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Construction work of entrance gate on Dharampath
in Ayodhya.
Completed 25-09-2023 30-12-2023 100 %
41 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Building Projects Construction work of Entry Gate at Sahadatganj in
Ayodhya.
Completed 25-09-2023 31-03-2024 100 %
42 Department of Housing and
Urban Planning
Mela Mad Augmentation Projects Construction work of parking near Gurukul Sanskrit
Mahavidyalaya in Ayodhya.
Completed 04-01-2024 10-01-2024 100 %
43 Department of Housing and
Urban Planning
Mela Mad Augmentation Projects Construction work of parking near the power house
in front of Ramkatha Park in Ayodhya.
Completed 04-01-2024 10-01-2024 100 %
44 Uttar Pradesh Tourism Uttar Pradesh Tourism Augmentation Projects Construction Work of Queen Ho Memorial Park,
Ayodhya
Completed 05-11-2018 30-09-2019 100 %

Work completed 

45 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Building Projects Construction work of Rajdwar Park stairs and ramp
on Bhaktipath.
Completed 30-01-2024 28-02-2024 100 %
46 Department of Housing and
Urban Planning
Department of Housing and
Urban Planning
Road Projects Construction work of roads in Transport Nagar. Completed 23-02-2024 22-08-2024 100 %
47 Culture Department Culture Department Augmentation Projects Cultural Stage Completed 05-12-2018 04-09-2019 100 %

समस्त कार्य
पूर्ण, इन्वेंटरी
तैयार की जा रही
है। 

48 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Tourism Decorative hanging bamboo light work in Ayodhya. Completed 05-01-2024 20-01-2024 100 %
49 Department of Urban
Development
Department of Urban
Development
Augmentation Projects Development of Rajdwar Park Completed 04-01-2020 03-07-2020 100 %

कार्य पूर्ण 

50 Uttar Pradesh Tourism Uttar Pradesh Tourism Augmentation Projects Development of Religious and Mythological Places
including Amenities for Public/Pilgrims on Chaudah
Kosi Parikrama Marg
Completed 23-11-2022 30-12-2024 100 %

• GO issued on 31 March 2022. • All
Work are Completed - चौदह कोसी
परिक्रमा के 12
प्रमुख स्थलों पर
विश्रामालय/ शौचालय
निर्माण,
विद्युतीकरण,
प्लम्बिंग आदि।

51 Department of Housing and
Urban Planning
Department of Housing and
Urban Planning
Road Projects Dharam Path (Bypass Road to Nayaghat) Completed 10-08-2023 09-02-2024 100 % ए- मुख्य मार्गः- 1-
डी0बी0एम0- 2.00 किमी0
पूर्ण। 2- बी0सी0- 2.00
किमी0 पूर्ण। 3- डेªन
एवं डक्ट- 3.00 किमी0
पूर्ण। बी- सर्विस
मार्ग (बन्धा पर)ः- 1-
जी0एस0बी0- 0.800 किमी0
पूर्ण। 2-
डब्लू0एम0एम0- 0.800
किमी0 पूर्ण। 3-
डी0बी0एम0-0.800 किमी0
पूर्ण। 4- बी0सी0- 0.800
किमी0 पूर्ण। सी-
फुटपाथः- 1-जी0एस0बी0-
1.40 किमी0 पूर्ण। 2-
डब्लू0एम0एम0- 1.400
किमी0 पूर्ण। 3-
पी0सी0सी0- 1.400 किमी0
पूर्ण। 4- कोवल
ब्लाक- 1.400 किमी0
पूर्ण। 5- सूर्य
स्तम्भ- 40 अदद
पूर्ण। 6-
इण्टरप्रेटेशन वाल-
81 अदद पूर्ण।
52 Department of Urban
Development
Ayodhya Development Authority Augmentation Projects Facade Beautification work on Bhakti path Completed 15-09-2023 30-12-2023 100 %

सिविल एवं पुट्टी
का कार्य पर्ण। शॉप
शइनेज एवं शटर
पेंटिग का कार्य 80
प्रतिशत पूर्ण एवं
पेन्टिंग का कार्य
प्रगति पर है।

53 Department of Urban
Development
Ayodhya Development Authority Augmentation Projects Facade Beautification work on Ram path Completed 15-09-2023 30-12-2023 100 %

फसाड सौंदर्यीकरण
में कॉर्निस,
बाउंड्रीवॉल,
पैरापेट, शॉप
साइनेज, शटर पेंट
एवं आर्चेस आदि के
कार्य प्रस्तावित
है।

54 Department of Urban
Development
Ayodhya Development Authority Augmentation Projects Facade Beautification work on Shri Ramjanm Bhumi
path
Completed 15-09-2023 30-12-2023 100 %

कार्य
पूर्ण

फिनिशिंग
का कार्य 70% पूर्ण हो
चूका है
|

द्वितीय
 भुगतन हो गया है
एवं अन्तिम भुगतान
की मांपे फर्म के
साथ संयुक्त रूप से
ली जा चुकी है |

55 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Tourism For the convenience of the devotees in Ayodhya,
the work of a stand to keep their belongings
organized.
Completed 10-04-2024 16-04-2024 100 %
56 Department of Housing and
Urban Planning
Department of Housing and
Urban Planning
Augmentation Projects Global Design Competition for Logo, Welcome Gate &
City Signages
Completed 20-09-2021 10-11-2021 100 %

Results have been declared

57 Education Department Uttar Pradesh Education
Department
Building Projects Government Inter College- Dadera Completed 01-03-2019 10-08-2020 100 %

समस्त कार्य पूर्ण
हस्तान्तान्तरण
प्रपत्र इस
कार्यालय के
पत्रांक 1673/कार्य-50/17
दिनांक 09-12-2021 द्वारा
जिला विद्यालय
निरीक्षक को
प्रेषित  

58 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Illumination work on major roads of
Ayodhya.(Roshni City Illumination SITC)
Completed 09-01-2024 23-01-2024 100 %
59 Department of Housing and
Urban Planning
Mela Mad Augmentation Projects In view of the arrival of Honorable Prime
Minister, work of cleaning and painting of crash
barrier on NH 27 from Sahadatganj to Ayodhya
bridge and washing of trees/plants, lifting of
debris and planting of seasonal saplings between
the dividers.
Completed 24-12-2023 29-12-2023 100 %
60 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Installation work of butterfly metal tree statue
in Ayodhya.
Completed 18-01-2024 03-02-2024 100 %
61 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Maintenance work along with supply and planting of
seasonal flowering plants in Ayodhya.
Completed 09-12-2023 08-12-2024 100 %
62 Education Department Uttar Pradesh Education
Department
Building Projects Navin Rajkiya High School, Baharas Completed 20-10-2011 20-03-2013 100 %

• work completed and inventory send on
dated 18-11-22.

63 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Painting of ceramic murals on walls along major
roads of Ayodhya.
Completed 14-10-2023 13-12-2023 100 %
64 Dharmarth Karya Vibhag Dharmarth Karya Vibhag Road Projects Panch Kosi Parikrama Marg Completed - - 10 %

• DPR submitted • Source of funding
to execute this project is to be finalized.
विषयगत कार्य का
डी0पी0आर0 रू0 474.99 करोड़
का मुख्य अभियन्ता
(मु0-1) लो0नि0वि0 लखनऊ
के पत्र सं0
1613नि0/140-01नि0/22-23 दिनॉक
06.01.2023 द्वारा
लो0नि0अनु0-11, उ0प्र0
शासन लखनऊ को
प्रेषित।

65 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Project of Tourism Development / Beautification
near the Samadhi Site Complex of Mahant Paramhans
Raj Chandradas Ji of District Ayodhya
Completed 10-06-2021 09-08-2021 100 %

Work Completed

66 Irrigation & Water Resources
Department
Irrigation & Water Resources
Department..
Augmentation Projects Ram Ki Paidi Remodeling (Part-B Remodeling of
Channel)
Completed 06-08-2019 10-01-2021 100 %

Work Completed

67 Education Department Department of vocational
Education and Skill
Development
Building Projects Repair and Renovation of Hostel block and Dining
Room at Govt. I.T.I Ayodhya District-Ayodhya
Completed 02-12-2023 01-12-2024 100 % Till date- 19.03.2024, renovation work remained
closed due to stay of PAC force in the hostel
block. At present the ground floor work of toilet
block of the building is complete and construction
work of one room on the first floor is complete
and the work of internal and external plastering
of the ground floor and first floor is complete,
putty and painting work and flooring work is
complete. Plastering work in the internal part of
ground floor and first floor of hostel block,
vitrified flooring on the floor of rooms and
granite flooring in corridor and putty and
painting work in external and internal part and
internal electrification work is complete and work
of fixture installation is complete. Plastering
work of internal part of dining room and vitrified
flooring on floor is complete, putty and painting
work in internal and external part and work of
casting of ceiling of kitchen is complete and
plastering work in internal part and flooring work
is complete. Brick coba work is complete on all
the ceilings of the building. Under sanitary work,
work of septic tank is complete and work of fixing
of flush door shutter for all the doors of the
building is complete. The transfer form
(inventory) for the transfer of the said work was
sent to the Principal vide letter no. 24/Y-1/01
dated 07.01.2025 of the division office.
68 Department of Housing and
Urban Planning
Ayodhya Development Authority Road Projects Road construction work in Devkali area of
​​Ayodhya.
Completed 24-07-2024 23-01-2025 100 %
69 Department of Housing and
Urban Planning
Mela Mad Building Projects Road construction work next to Fatikshila in
Ayodhya.
Completed 03-01-2024 10-01-2024 100 %
70 Department of Urban
Development
Department of Urban
Development
Water Rudauli Municipal Corporation Water Supply
Reorganisation (Rudauli, Tehsil Rudauli)
Completed 07-01-2018 31-03-2021 100 %

• Work completed handing over is under
progress.

71 Department of Urban
Development
Department of Urban
Development
Sewerage Plant Sewer Connection Scheme Phase-2 of Ayodhya Nagar Completed 02-02-2021 30-11-2021 100 %

Completed

72 Dharmarth Karya Vibhag Dharmarth Karya Vibhag Augmentation Projects Sound System Work in Bhajan Sandhya Location Completed 30-09-2021 31-10-2021 100 %

Work completed

73 Uttar Pradesh Public Works
Department
Uttar Pradesh Public Works
Department
Building Projects Strengthening of the Official Residence of
District Magistrate Ayodhya in Ayodhya District
Completed 21-06-2021 31-12-2021 100 %

• work completed

74 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Supply and installation of outdoor multicolored
neon lights in various artistic shapes in Ayodhya.
Completed 06-12-2023 05-01-2024 100 %
75 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects The work of appointing an agency for flower
decoration on the main roads of Ayodhya.
Completed 17-01-2024 02-02-2024 100 %
76 Education Department Uttar Pradesh Education
Department
Building Projects The Work of Strengthening the Central Plan
District Education and Training Institute, Ayodhya
Completed 31-03-2015 30-06-2021 100 %

Work Complete

77 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Tourism Development for Gauraiya Devi Temple,
Bikapur
Completed 27-07-2021 26-10-2021 100 %

Project Handed over

78 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Tourism Development for Kamakhya Devi, Rudauli Completed 24-05-2021 23-08-2021 100 %

Project Handed over

79 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Tourism Development for Ashtabhuja Durga Temple
Ayodhya
Completed 18-05-2021 17-08-2021 100 %

Work Compleetd

80 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Tourism Development for Hathi Ram Baba Temple,
Gosaiganj
Completed 29-05-2021 28-08-2021 100 %

Work in Complete

81 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism Tourism Development for Sidhnath Dham, Milkipur Completed 27-05-2021 26-08-2021 100 %

Work Compleetd

82 Uttar Pradesh Public Works
Department
Uttar Pradesh Tourism Tourism Tourism Development of Block Tarun, Thariyakala
Bishun Baba Site of Ayodhya District.
Completed 20-09-2021 19-11-2021 100 %

completed.

83 Uttar Pradesh Public Works
Department
Uttar Pradesh Public Works
Department
Road Projects Widening, Strengthening and Beautification Work of
Nayaghat Chauraha
Completed 26-03-2021 25-11-2021 100 %

Work completed.

84 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of installing Ayodhya logo on electric poles
at various places in Ayodhya.
Completed 05-01-2024 20-01-2024 100 %
85 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of installing Big Ayodhya logo at various
places in Ayodhya.
Completed 28-12-2023 - 100 %
86 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Road Projects Work of installing concrete planters on four major
roads of Ayodhya.
Completed 10-08-2023 09-10-2023 100 %
87 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of installing Gobo projector lights in
Ayodhya.
Completed 09-01-2024 23-01-2024 100 %
88 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of installing iron manual drop boom barriers
at various places on Rampath and Bhaktipath of
Ayodhya.
Completed 01-03-2024 30-03-2024 100 %
89 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Tourism Work of installing LED strip lights to illuminate
the facade in Ayodhya.
Completed 10-01-2024 30-01-2024 100 %
90 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of installing outdoor decorative multicolored
neon lights in various shapes in Ayodhya.
Completed 05-01-2024 20-04-2024 100 %
91 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of making mosaic art on the walls along the
main roads of Ayodhya.
Completed 14-10-2023 28-11-2023 100 %
92 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of making murals made of GRC on the walls
along the main roads of Ayodhya.
Completed 14-10-2023 27-11-2023 100 %
93 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of making murals using cobble-pabble on the
walls along the major roads of Ayodhya.
Completed 24-02-2024 23-04-2024 100 %
94 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of making murals using terracotta fine soil
on the boundary walls of the main roads of
Ayodhya.
Completed 14-10-2024 15-01-2024 100 %
95 Department of Housing and
Urban Planning
Mela Mad Road Projects Work of strengthening of pre-built roads for the
access road of the tent city under construction in
Navya Ayodhya (Green Field Township).
Completed 17-01-2024 27-01-2024 100 %
96 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of supply and installation of architectural
lights under the development project by Façade
near Rampath in Ayodhya.
Completed 18-09-2023 31-10-2023 100 %
97 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of supply and installation of Ayodhya's
symbolic symbol (logo) for selection of agency
under Rampath Frontage Development Project in
Ayodhya district.
Completed 18-09-2023 17-03-2024 100 %
98 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of supply and installation of illuminated
dandelion poles in Ayodhya.
Completed 18-01-2024 03-02-2024 100 %
99 Department of Housing and
Urban Planning
Ayodhya Sanrakshan Nidhi Augmentation Projects Work of supply, installation, testing and
commissioning of Shri Ram Stambh at 25 places
along the major roads in Ayodhya.
Completed 10-08-2023 09-10-2023 100 %
100 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या के
वि0स0क्षेत्र
बीकापुर में स्थित
सिद्धेश्वर मन्दिर
का पर्यटन विकास
कार्य।
Completed - - 100 %

Completed and Handed over

101 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या के
सरयू नदी के दायें
तट पर गुप्तार घाट व
राजघाट के मध्य नये
पक्के घाटों एवं
पूर्व निर्मित
घाटों पर
पुनरोद्धार का
कार्य।
Completed 15-04-2023 30-06-2023 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

102 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या में
चैरासी परिक्रमा
मार्ग पर स्थित
(कुण्डों) के पर्यटन
स्थलों का पर्यटन
विकास/ निर्माण
कार्य।
Completed 02-01-2023 28-02-2023 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

103 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या में
पंचकोसी परिक्रमा
मार्ग पर स्थित
पर्यटन स्थलों का
पर्यटन
विकास/निर्माण
कार्य।
Completed 02-01-2023 28-02-2023 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

104 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या में
राम की पैड़ी पर
दीपोत्सव एवं अन्य
मेले/महोत्सवों
हेतु दर्शक दीर्घा
का निर्माण कार्य।
Completed 05-05-2023 31-07-2023 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

105 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या में
राम की पैड़ी पर लाइट
एण्ड साउण्ड शो का
कार्य।
Completed 15-05-2023 31-08-2023 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

106 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या में
स्थित प्राचीन संत
रविदास मन्दिर में
मूलभूत सुविधाएं
एवं सौन्दर्यीकरण
कार्य।
Completed - - 100 % Completed and Handed over
107 Uttar Pradesh Tourism Uttar Pradesh Tourism Tourism जनपद अयोध्या विकास
खण्ड बीकापुर में
स्थित माता
कवरजाधाम मन्दिर का
सौन्दर्यीकरण एवं
पर्यटन विकास
कार्य।
Completed - - 100 % Completed & Handed over
108 Education Department Uttar Pradesh Education
Department
Building Projects जनपद-अयोध्या के
ब्लाक अमानीगंज के
कस्तूरबा गांधी
विद्यालय में 100 बेड
क्षमता छात्रावास
का निर्माण
Completed 15-11-2019 31-12-0020 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।

109 Education Department Uttar Pradesh Education
Department
Building Projects जनपद-अयोध्या के
ब्लाक सोहावल के
कस्तूरबा गांधी
विद्यालय में 100 बेड
क्षमता छात्रावास
का निर्माण
Completed 15-11-2019 31-01-2020 100 %

अवशेष धन की
प्रत्याशा में
कार्य पूर्ण।


कार्यदायी संस्था:Central Public Works Department (CPWD)

गातिमान परियोजना नाम:Construction of 100 Bedded MCH Hospital at IMS BHU Varanasi

कार्य आरंभ करने की तिथि कार्य पूर्ण करने की तिथि परियोजना लागत (रू0 लाख में) पुनरीक्षित लागत (रू0 लाख में) क्रमिक अवमुक्त धनराशि (रू0 लाख में) क्रमिक व्यय (रू0 लाख में) परियोजना क्रमिक भौतिकप्रगति (प्रतिशत में)
15-04-2018 31-08-2020 4550 0 3620 3650 100
Last Meeting Instruction
28-09-2020 सर सुन्दर लाल चिकित्सालय बी0एच0यू में 100 शैयायुक्त मेटर्निंटी विंग की प्रगति 100.00 प्रतिशत है। अवगत कराया गया कि बिल्डिंग तैयार है तथा साफ सफाई का कार्य चल रहा है, किन्तु आपरेशनल करने के लिये मेडिकल इक्यूपमेंट और बेड व एक्स-रे इत्यादि की व्यवस्था बी0एच0यू0 को करना है जिस हेतु बी0एच0यू0 द्वारा आवश्यक कार्यवाही की जा रही है।
Issues
28-09-2020 सर सुन्दर लाल चिकित्सालय बी0एच0यू में 100 शैयायुक्त मेटर्निंटी विंग की प्रगति 100.00 प्रतिशत है। अवगत कराया गया कि बिल्डिंग तैयार है तथा साफ सफाई का कार्य चल रहा है, किन्तु आपरेशनल करने के लिये मेडिकल इक्यूपमेंट और बेड व एक्स-रे इत्यादि की व्यवस्था बी0एच0यू0 को करना है जिस हेतु बी0एच0यू0 द्वारा आवश्यक कार्यवाही की जा रही है।

Company
  • Home
  • Contact Us
Follow Us

Stay tuned for the Upcoming events & News

Address

© 2025 Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved

©2025Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved