Program Management Unit
Ayodhya

  • Home
  • Executing Agencies
    • Priority
    • All
  • Departments
    • Priority
    • All
  • Contact Us
  • Search Project
  • Login
×
  1. Performance Monitoring & Evaluation Dashboard
title=

Transparent Status of on-going Project

title=

Program Management System Ayodhya

title=

Milestone Level Report

 News & Notices

PROJECTS LIST (Ayodhya Development Authority)


Sr.No. Project ID Project Name Actual Start Date Finish Date Project Cost (Crs) Physical Progress
1 ADADOP00022 Development of Public Amenities,Facilities and
Parking at Tedhi Bazar Crossing (West Side)
09-04-2022 15-08-2023 62.84 100 %
2 ADACWO00023 Construction work of Arundhati Parking (MLCP),
Commercial Complex located at Tedhi bazar, Ayodhya
(District Panchyat - East Side)
17-12-2021 20-09-2023 28.49 100 %
3 ADADOP00026 Development of Public Amenities, Facilities and
Parking at Kaushlesh Kunj MLCP.
19-12-2021 20-09-2023 4.79 99 %
4 ADAPOP00027 Proposal of Public Amenities and Two Floor Parking
near Amaniganj Jalkal Ayodhya Road MLCP
04-01-2022 25-09-2023 17.29 100 %
5 ADAILR00033 In-situ Lake Rejuvenation, Civil Work and
Community Engagement for Eight Lakes in Ayodhya
including Operation & Maintenance
03-11-2021 15-10-2023 5.72 100 %
6 ADAMP2000110 Master Plan 2031 (Phase 2) - - 0.92 75 %
7 ADADOP000118 Development/Construction of Public Amenities at
Panchkosi Parikrama Marg
23-11-2022 31-03-2024 17.85 78 %
8 ADADOR000120 Development of Religious and Mythological Places
including Amenities for Public/Pilgrims on Chaudah
Kosi Parikrama Marg
23-11-2022 31-03-2024 12.11 70 %
9 ADABOS000126 Beautification of Surya Kund by Providing Public
Amenities for Pilgrims in Ayodhya
17-12-2021 30-09-2023 23.8 100 %
10 ADASCT000127 Saketpuri Colony to Parikrama Marg Road
Development Work
24-12-2021 30-09-2023 6.5 80 %
11 ADADWO000128 Development Work of Samda Lake in District Ayodhya 28-05-2022 31-07-2023 9.67 100 %
12 ADACOT000135 Construction of Thirty Eight Numbers Mini MIG
Houses under Chief Minister Scheme
28-03-2021 31-10-2022 9.54 100 %
13 ADAPOP000142 Proposal of Public Amenities and Single Floor
Parking in Nazul Plot of Machharhatta Street
Ayodhya
- - 44.26 %
14 ADAROS000318 Restoration of Surya Temple at Surya Kund,
Ayodhya, Uttar Pradesh
15-07-2022 31-12-2023 0.48 100 %
15 ADACWO000363 Construction work of roads in transport nagar by
ayodhya development authority
23-02-2024 22-08-2024 19.41 40 %
16 ADAERA000371 Eco Resort at Samda Lake - - - %
17 ADARPA000386 Revitalization, Preservation, and Restoration of
Selected Historical Landmarks and Sites through
Surface Improvement, Mural Painting, Installations
and Artwork at Selected Locations in Ayodhya
Part-2
23-11-2022 25-09-2023 1.13 99 %
18 ADAFBW0001137 Facade Beautification work on Ram path 15-09-2023 01-12-2024 30.93 100 %
19 ADAFBW0001138 Facade Beautification work on Bhakti path 15-09-2023 30-12-2023 4.2 100 %
20 ADAFBW0001139 Facade Beautification work on Shri Ramjanm Bhumi
path
15-09-2023 01-02-2024 5.1 100 %
21 ADACWO0001150 Construction work of Chowpatty near Ram Ki Paidi. 14-03-2024 13-09-2024 4.65 1 %
22 ADACRD0001153 CC road, drain and street light work in JB Puram
Colony.
15-03-2023 14-09-2024 2.95 %
23 ADACWO0001154 Construction work of road and drain in Shankargarh
area in Ayodhya.
14-03-2024 14-09-2024 4.8 %
24 ADAWOS0001155 Work of sewer, water line etc. in Vashishtha Kunj
Yojana.
16-03-2024 15-12-2024 67 %
25 ADAWOI0001156 Work of installing Ayodhya logo at various places
in Ayodhya.
28-12-2023 16-01-2024 0.35 %
26 ADADHB0001157 Decorative hanging bamboo light work in Ayodhya. 05-01-2024 20-01-2024 0.96 23 %
27 ADAWOI0001158 Work of installing LED strip lights to illuminate
the facade in Ayodhya.
10-01-2024 30-01-2024 0.72 13 %
28 ADAWOI0001159 Work of installing outdoor decorative multicolored
neon lights in various shapes in Ayodhya.
05-01-2024 20-04-2024 1.18 50 %
29 ADACWO0001160 Construction work of entrance gate on Dharampath
in Ayodhya.
25-09-2023 24-12-2023 3.1 100 %
30 ADACWO0001161 Construction work of entry gate at Sahadatganj in
Ayodhya.
25-09-2023 25-09-2024 1.85 %
31 ADASAI0001162 Supply and installation of outdoor multicolored
neon lights in various artistic shapes in Ayodhya.
06-12-2023 05-02-2024 0.35 100 %
32 ADAIWO0001163 Illumination work on major roads of
Ayodhya.(Roshni City Illumination SITC)
09-01-2024 23-01-2024 5.39 25 %
33 ADAWOS0001164 Work of supply and installation of illuminated
dandelion poles in Ayodhya.
18-01-2024 03-02-2024 0.79 1 %
34 ADAWOI0001165 Work of installing Gobo projector lights in
Ayodhya.
09-01-2024 23-01-2024 1.73 36 %
35 ADAIWO0001166 Installation work of butterfly metal tree statue
in Ayodhya.
18-01-2024 03-02-2024 0.37 1 %
36 ADAWOL0001167 Work of laser cut aluminized artistic SITC in
Ayodhya (Hybycozo)
17-01-2024 02-02-2024 0.67 %
37 ADAWOM0001168 Work of making murals using cobble-pabble on the
walls along the major roads of Ayodhya.
24-02-2024 23-04-2024 0.38 1 %
38 ADAWOM0001169 Work of making murals made of GRC on the walls
along the main roads of Ayodhya.
14-10-2023 27-11-2024 0.47 81 %
39 ADAWOM0001171 Work of making murals using terracotta fine soil
on the boundary walls of the main roads of
Ayodhya.
14-10-2024 15-01-2024 1.77 100 %
40 ADAPOC0001172 Painting of ceramic murals on walls along major
roads of Ayodhya.
14-10-2023 13-12-2024 0.22 100 %
41 ADAWOM0001173 Work of making mosaic art on the walls along the
main roads of Ayodhya.
14-10-2023 28-11-2023 0.16 30 %
42 ADACOT0001174 CNC on the walls along the main roads of Ayodhya.
Making cut metal murals.
14-10-2023 29-11-2023 0.38 %
43 ADAMWA0001175 Maintenance work along with supply and planting of
seasonal flowering plants in Ayodhya.
09-12-2023 - 1.01 25 %
44 ADAWOI0001176 Work of installing concrete planters on four major
roads of Ayodhya.
10-08-2023 09-10-2023 2.71 30 %
45 ADAWOS0001177 Work of supply, installation, testing and
commissioning of Shri Ram Stambh at 25 places
along the major roads in Ayodhya.
10-08-2023 09-10-2023 2.48 100 %
46 ADAWOI0001178 Work of installing Ayodhya logo on electric poles
at various places in Ayodhya.
05-01-2024 20-01-2024 2.36 %
47 ADAWOS0001179 Work of supply and installation of Ayodhya's
symbolic symbol (logo) for selection of agency
under Rampath Frontage Development Project in
Ayodhya district.
18-09-2023 17-03-2024 0.86 100 %
48 ADAWOI0001180 Work of installing iron manual drop boom barriers
at various places on Rampath and Bhaktipath of
Ayodhya.
01-03-2024 30-03-2024 0.38 80 %
49 ADAWOS0001181 Work of supply and installation of architectural
lights under the development project by Fasad near
Rampath in Ayodhya.
18-09-2023 31-10-2023 2.2 10 %
50 ADACWO0001182 Construction work of Rajdwar Park stairs and ramp
on Bhaktipath.
30-01-2024 28-02-2024 1.73 70 %
51 ADATWO0001183 The work of appointing an agency for flower
decoration on the main roads of Ayodhya.
17-01-2024 02-02-2024 1.95 100 %
52 ADAFUT0001184 Firozpur Upahar Tehsil- Construction work of
boundary wall and gate in Sohawal, Vashishtha Kunj
scheme.
17-12-2023 16-03-2024 3.75 40 %
53 ADABWI0001185 Beautification work in front of the airport gate
on Naka bypass.
24-12-2023 29-12-2023 0.23 100 %
54 ADAFTC0001186 For the convenience of the devotees in Ayodhya,
the work of a stand to keep their belongings
organized.
10-04-2024 16-04-2024 0.13 100 %
55 ADABWF0001187 Barricading work for the visitors to visit Ayodhya
in a protective manner.
- - 0.52 100 %
56 ADABWF0001188 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part-2)
- - 0.52 100 %
57 ADABWF0001189 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 3)
- - 0.52 100 %
58 ADABWF0001190 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 4)
05-04-2024 05-04-2024 0.52 100 %
59 ADACWO0001191 Construction work of parking near Gurukul Sanskrit
Mahavidyalaya in Ayodhya.
04-01-0024 10-01-2024 0.43 100 %
60 ADACWO0001192 Construction work of parking near the power house
in front of Ramkatha Park in Ayodhya.
- - 0.92 100 %
61 ADARCW0001193 Road construction work next to Fatikshila in
Ayodhya.
03-01-2024 10-01-2024 0.85 100 %
62 ADACWO0001194 Construction work of a new access road for the
tent city to be built in Nav Ayodhya from the
national highway.
- - 0.55 100 %
63 ADAWOS0001195 Work of strengthening of pre-built roads for the
access road of the tent city under construction in
Navya Ayodhya (Green Field Township).
17-01-2024 27-01-2024 1.5 100 %
64 ADAIVO0001196 In view of the arrival of Honorable Prime
Minister, work of cleaning and painting of crash
barrier on NH 27 from Sahadatganj to Ayodhya
bridge and washing of trees/plants, lifting of
debris and planting of seasonal saplings between
the dividers.
24-12-2023 29-12-2023 7.62 100 %

PROJECT GANTT CHART


Development of Public Amenities,Facilities and Parking at Tedhi Bazar Crossing (West Side)
Company
  • Home
  • Contact Us
Follow Us

Stay tuned for the Upcoming events & News

Address

© 2024 Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved

©2024Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved