  1. Performance Monitoring & Evaluation Dashboard
title=

Transparent Status of on-going Project

title=

Program Management System Ayodhya

title=

Milestone Level Report

 News & Notices

PROJECTS LIST (Ayodhya Development Authority)


Sr.No. Project ID Project Name Actual Start Date Finish Date Project Cost (Crs) Physical Progress
1 ADAGDC0004 Global Design Competition for Logo, Welcome Gate &
City Signages
20-09-2021 10-11-2021 0.25 100 %
2 ADAMP20006 Master Plan 2031(Phase-1) 10-10-2019 31-07-2022 0.74 100 %
3 ADADOP00022 Development of Public Amenities,Facilities and
Parking at Tedhi Bazar Crossing (West Side)
09-04-2022 15-08-2023 62.84 100 %
4 ADACWO00023 Construction work of Arundhati Parking (MLCP),
Commercial Complex located at Tedhi bazar, Ayodhya
(District Panchyat - East Side)
17-12-2021 20-09-2023 28.49 100 %
5 ADADOP00026 Development of Public Amenities, Facilities and
Parking at Kaushlesh Kunj MLCP.
19-12-2021 20-09-2023 4.79 99 %
6 ADAPOP00027 Proposal of Public Amenities and Two Floor Parking
near Amaniganj Jalkal Ayodhya Road MLCP
04-01-2022 25-09-2023 17.29 100 %
7 ADARPA00032 Revitalization, Preservation, and Restoration of
Selected Historical Landmarks and Sites through
Surface Improvement, Mural Painting, Installations
and Artwork at Selected Locations in Ayodhya
Part-1
31-08-2021 30-09-2022 1.33 100 %
8 ADAILR00033 In-situ Lake Rejuvenation, Civil Work and
Community Engagement for Eight Lakes in Ayodhya
including Operation & Maintenance
03-11-2021 15-10-2023 5.72 100 %
9 ADAMP2000110 Master Plan 2031 (Phase 2) 12-03-2022 30-06-2025 0.92 90 %
10 ADADOP000118 Development/Construction of Public Amenities at
Panchkosi Parikrama Marg
23-11-2022 15-02-2025 17.85 95 %
11 ADADOR000120 Development of Religious and Mythological Places
including Amenities for Public/Pilgrims on Chaudah
Kosi Parikrama Marg
23-11-2022 31-12-2024 12.11 100 %
12 ADADWI000122 Development Work in Guptar Ghat for Kiosk Shop,
Parking, Pathway Phase-1
25-12-2021 31-01-2023 14.24 100 %
13 ADACOE000124 Construction of EWS Houses (G+3) under PMAY
(Part-B )
15-01-2019 30-09-2022 10.38 100 %
14 ADACOE000125 Construction of EWS Houses (G+3) under PMAY
(Part-A )
15-01-2019 30-09-2022 11.49 100 %
15 ADABOS000126 Beautification of Surya Kund by Providing Public
Amenities for Pilgrims in Ayodhya
17-12-2021 30-09-2023 23.8 100 %
16 ADASCT000127 Saketpuri Colony to Parikrama Marg Road
Development Work
24-12-2021 31-08-2024 6.5 100 %
17 ADADWO000128 Development Work of Samda Lake in District Ayodhya 28-05-2022 31-07-2023 9.67 100 %
18 ADACOT000135 Construction of Thirty Eight Numbers Mini MIG
Houses under Chief Minister Scheme
28-03-2021 31-10-2022 9.54 100 %
19 ADAPOP000142 Proposal of Public Amenities and Single Floor
Parking in Nazul Plot of Machharhatta Street
Ayodhya
21-01-2025 20-06-2027 44.25 4 %
20 ADACOA000262 Construction of Ayodhya Development Authority and
Ayodhya Municipal Corporation office building
01-01-2025 11-01-2025 119.9 65 %
21 ADAROS000318 Restoration of Surya Temple at Surya Kund,
Ayodhya, Uttar Pradesh
15-07-2022 31-12-2023 0.48 100 %
22 ADACWO000363 Construction work of roads in Transport Nagar. 23-02-2024 31-03-2025 19.41 100 %
23 ADARPA000386 Revitalization, Preservation, and Restoration of
Selected Historical Landmarks and Sites through
Surface Improvement, Mural Painting, Installations
and Artwork at Selected Locations in Ayodhya
Part-2
23-11-2022 25-09-2023 1.13 99 %
24 ADAFBW0001137 Facade Beautification work on Ram path 15-09-2023 01-12-2024 30.93 100 %
25 ADAFBW0001138 Facade Beautification work on Bhakti path 15-09-2023 30-12-2023 4.2 100 %
26 ADAFBW0001139 Facade Beautification work on Shri Ramjanm Bhumi
path
15-09-2023 01-02-2024 5.1 100 %
27 ADACWO0001150 Construction work of Chowpatty near Ram Ki Paidi. 14-03-2024 31-05-2025 5.57 75 %
28 ADACRD0001153 CC road, drain and street light work in JB Puram
Colony.
15-03-2023 31-03-2025 2.95 100 %
29 ADACWO0001154 Construction work of road and drain in Shankargarh
area in Ayodhya.
14-03-2024 30-05-2025 4.8 92 %
30 ADAWOS0001155 Work of sewer, water line etc. in Vashishtha Kunj
Yojana.
16-03-2024 31-12-2025 56.85 22 %
31 ADAWOI0001156 Work of installing Big Ayodhya logo at various
places in Ayodhya.
28-12-2023 31-01-2024 0.7 100 %
32 ADADHB0001157 Decorative hanging bamboo light work in Ayodhya. 05-01-2024 31-12-2024 0.96 100 %
33 ADAWOI0001158 Work of installing LED strip lights to illuminate
the facade in Ayodhya.
10-01-2024 31-03-2024 0.72 100 %
34 ADAWOI0001159 Work of installing outdoor decorative multicolored
neon lights in various shapes in Ayodhya.
05-01-2024 20-04-2024 1.18 100 %
35 ADACWO0001160 Construction work of entrance gate on Dharampath
in Ayodhya.
25-09-2023 31-12-2023 3.1 100 %
36 ADACWO0001161 Construction work of Entry Gate at Sahadatganj in
Ayodhya.
25-09-2023 25-09-2024 1.85 100 %
37 ADASAI0001162 Supply and installation of outdoor multicolored
neon lights in various artistic shapes in Ayodhya.
06-12-2023 29-02-2024 0.35 100 %
38 ADAIWO0001163 Illumination work on major roads of
Ayodhya.(Roshni City Illumination SITC)
09-01-2024 31-01-2025 4.57 100 %
39 ADAWOS0001164 Work of supply and installation of illuminated
dandelion poles in Ayodhya.
18-01-2024 30-09-2024 0.79 100 %
40 ADAWOI0001165 Work of installing Gobo projector lights in
Ayodhya.
09-01-2024 28-02-2025 1.47 100 %
41 ADAIWO0001166 Installation work of butterfly metal tree statue
in Ayodhya.
18-01-2024 31-05-2024 0.37 100 %
42 ADAWOM0001168 Work of making murals using cobble-pabble on the
walls along the major roads of Ayodhya.
24-02-2024 30-09-2024 0.38 100 %
43 ADAWOM0001169 Work of making murals made of GRC on the walls
along the main roads of Ayodhya.
14-10-2023 30-09-2024 0.47 100 %
44 ADAWOM0001171 Work of making murals using terracotta fine soil
on the boundary walls of the main roads of
Ayodhya.
14-10-2024 15-01-2024 1.77 100 %
45 ADAPOC0001172 Painting of ceramic murals on walls along major
roads of Ayodhya.
14-10-2023 13-12-2024 0.22 100 %
46 ADAWOM0001173 Work of making mosaic art on the walls along the
main roads of Ayodhya.
14-10-2023 28-11-2023 0.16 100 %
47 ADACOT0001174 CNC on the walls along the main roads of Ayodhya.
Making cut metal murals.
14-10-2023 29-11-2023 0.38 100 %
48 ADAMWA0001175 Maintenance work along with supply and planting of
seasonal flowering plants in Ayodhya.
09-12-2023 30-11-2024 1.01 100 %
49 ADAWOI0001176 Work of installing concrete planters on four major
roads of Ayodhya.
10-08-2023 09-10-2023 2.71 100 %
50 ADAWOS0001177 Work of supply, installation, testing and
commissioning of Shri Ram Stambh at 25 places
along the major roads in Ayodhya.
10-08-2023 09-10-2023 2.48 100 %
51 ADAWOI0001178 Work of installing Ayodhya logo on electric poles
at various places in Ayodhya.
05-01-2024 28-02-2025 2 100 %
52 ADAWOS0001179 Work of supply and installation of Ayodhya's
symbolic symbol (logo) for selection of agency
under Rampath Frontage Development Project in
Ayodhya district.
18-09-2023 17-03-2024 0.86 100 %
53 ADAWOI0001180 Work of installing iron manual drop boom barriers
at various places on Rampath and Bhaktipath of
Ayodhya.
01-03-2024 30-03-2024 0.38 100 %
54 ADAWOS0001181 Work of supply and installation of architectural
lights under the development project by Façade
near Rampath in Ayodhya.
18-09-2023 31-01-2025 1.87 100 %
55 ADACWO0001182 Construction work of Rajdwar Park stairs and ramp
on Bhaktipath.
30-01-2024 10-08-2024 1.73 100 %
56 ADATWO0001183 The work of appointing an agency for flower
decoration on the main roads of Ayodhya.
17-01-2024 02-02-2024 1.95 100 %
57 ADAFUT0001184 Firozpur Upahar Tehsil- Construction work of
boundary wall and gate in Sohawal, Vashishtha Kunj
scheme.
18-09-2023 31-12-2025 3.18 92 %
58 ADABWI0001185 Beautification work in front of the airport gate
on Naka bypass.
24-12-2023 29-12-2023 0.23 100 %
59 ADAFTC0001186 For the convenience of the devotees in Ayodhya,
the work of a stand to keep their belongings
organized.
10-04-2024 16-04-2024 0.13 100 %
60 ADABWF0001187 Barricading work for the visitors to visit Ayodhya
in a protective manner.
- - 0.52 100 %
61 ADABWF0001188 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part-2)
- - 0.52 100 %
62 ADABWF0001189 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 3)
- 31-05-2024 0.52 100 %
63 ADABWF0001190 Barricading work for the visitors to visit Ayodhya
in a protective manner. (Part 4)
05-04-2024 05-04-2024 0.52 100 %
64 ADACWO0001191 Construction work of parking near Gurukul Sanskrit
Mahavidyalaya in Ayodhya.
04-01-0024 10-01-2024 0.43 100 %
65 ADACWO0001192 Construction work of parking near the power house
in front of Ramkatha Park in Ayodhya.
- - 0.92 100 %
66 ADARCW0001193 Road construction work next to Fatikshila in
Ayodhya.
03-01-2024 10-01-2024 0.85 100 %
67 ADACWO0001194 Construction work of a new access road for the
tent city to be built in Nav Ayodhya from the
national highway.
- - 0.55 100 %
68 ADAWOS0001195 Work of strengthening of pre-built roads for the
access road of the tent city under construction in
Navya Ayodhya (Green Field Township).
17-01-2024 27-01-2024 1.5 100 %
69 ADAIVO0001196 In view of the arrival of Honorable Prime
Minister, work of cleaning and painting of crash
barrier on NH 27 from Sahadatganj to Ayodhya
bridge and washing of trees/plants, lifting of
debris and planting of seasonal saplings between
the dividers.
24-12-2023 29-12-2023 7.62 100 %
70 ADADWO0001199 Development work of raw drain from Fatehganj
vegetable market to Sahabganj under the
construction of drain coming out of Fatehganj
vegetable market and going to Pathan Tola on
Chaudhakosi Parikrama Marg - First phase.
10-12-2024 09-12-2025 15.02 34 %
71 ADADWO0001200 Development work of raw drain from Fatehganj
vegetable market to Sahabganj under the
construction of drain coming out of Fatehganj
vegetable market and going to Pathan Tola on
Chaudhakosi Parikrama Marg - second phase.
10-12-2024 09-12-2025 18.19 32 %
72 ADADWO0001201 Development work of Drain in residential colonies
located in the south direction of Ayodhya and
developed by the authority, such as Kaushalpuri
Phase-1, Phase-2, Avadh Vihar, Transport Nagar
15-11-2024 14-11-2025 23.62 33 %
73 ADADWO0001202 Development work of Jalpa Nala 15-11-2024 14-11-2025 19.45 32 %
74 ADADWO0001203 Development work of telai nala 15-11-2024 14-11-2025 29.8 33 %
75 ADARCW0001204 Road construction work in Devkali area of
​​Ayodhya.
24-07-2024 31-03-2025 4.83 100 %
76 ADACWO0001205 Construction work of Tilak entrance near Hanuman
Cave on Panchkosi road.
10-01-2025 07-09-2025 1.89 58 %
77 ADACWO0001206 Construction work of the Surya Entrance gate near
at Airport.
10-01-2025 07-09-2025 1.14 5 %
78 ADACWO0001207 Construction work of 35 smart public toilets in
Ayodhya city.
20-09-2024 20-03-2026 15.62 16 %

PROJECT GANTT CHART


A PHP Error was encountered

Severity: Notice

Message: Undefined offset: 0

Filename: home/index_view1.php

Line Number: 798

Backtrace:

File: /var/www/html/pmoayodhya/ayodhyann/application/views/home/index_view1.php
Line: 798
Function: _error_handler

File: /var/www/html/pmoayodhya/ayodhyann/application/controllers/Home.php
Line: 82
Function: view

File: /var/www/html/pmoayodhya/ayodhyann/index.php
Line: 328
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property 'project_name' of non-object

Filename: home/index_view1.php

Line Number: 798

Backtrace:

File: /var/www/html/pmoayodhya/ayodhyann/application/views/home/index_view1.php
Line: 798
Function: _error_handler

File: /var/www/html/pmoayodhya/ayodhyann/application/controllers/Home.php
Line: 82
Function: view

File: /var/www/html/pmoayodhya/ayodhyann/index.php
Line: 328
Function: require_once

Gantt Chart data not availble in this projects.

Company
  • Home
  • Contact Us
Follow Us

Stay tuned for the Upcoming events & News

Address

© 2025 Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved

©2025Ayodhya Development Authority, Program Management Unit, Ayodhya All Rights Reserved