English
Hindi
Program Management Unit
Ayodhya
Toggle navigation
Home
Executing Agencies
Priority
All
Departments
Priority
All
Contact Us
Search Project
Login
Search Projects...........
Construction of 50 Rooms for 100 Students along with a Toilet Block on the First Floor, Warden Room with Attached Toilet in Acharya Narendra Deva University of Agriculture and Technology.(APMCO500068)
Construction of Pre-Engineered Buildings (PEB) and other associated works on Design & Build Basis (EPC)(AAOCOP000330)
Work related to rain water drainage of Ksheer Sagar under the first phase of developing a system for rain water drainage in Ayodhya city.(AAOWRT0001152)
Work of making murals made of FRP on the walls along the main roads of Ayodhya.(AAOWOM0001170)
Development of Public Amenities,Facilities and Parking at Tedhi Bazar Crossing (West Side)(ADADOP00022)
Construction work of Arundhati Parking (MLCP), Commercial Complex located at Tedhi bazar, Ayodhya (District Panchyat - East Side)(ADACWO00023)
Development of Public Amenities, Facilities and Parking at Kaushlesh Kunj MLCP.(ADADOP00026)
Proposal of Public Amenities and Two Floor Parking near Amaniganj Jalkal Ayodhya Road MLCP(ADAPOP00027)
In-situ Lake Rejuvenation, Civil Work and Community Engagement for Eight Lakes in Ayodhya including Operation & Maintenance(ADAILR00033)
Master Plan 2031 (Phase 2)(ADAMP2000110)
Development/Construction of Public Amenities at Panchkosi Parikrama Marg(ADADOP000118)
Development of Religious and Mythological Places including Amenities for Public/Pilgrims on Chaudah Kosi Parikrama Marg(ADADOR000120)
Beautification of Surya Kund by Providing Public Amenities for Pilgrims in Ayodhya(ADABOS000126)
Saketpuri Colony to Parikrama Marg Road Development Work(ADASCT000127)
Development Work of Samda Lake in District Ayodhya(ADADWO000128)
Construction of Thirty Eight Numbers Mini MIG Houses under Chief Minister Scheme(ADACOT000135)
Proposal of Public Amenities and Single Floor Parking in Nazul Plot of Machharhatta Street Ayodhya(ADAPOP000142)
Restoration of Surya Temple at Surya Kund, Ayodhya, Uttar Pradesh(ADAROS000318)
Construction work of roads in transport nagar by ayodhya development authority(ADACWO000363)
Eco Resort at Samda Lake(ADAERA000371)
Revitalization, Preservation, and Restoration of Selected Historical Landmarks and Sites through Surface Improvement, Mural Painting, Installations and Artwork at Selected Locations in Ayodhya Part-2(ADARPA000386)
Facade Beautification work on Ram path(ADAFBW0001137)
Facade Beautification work on Bhakti path(ADAFBW0001138)
Facade Beautification work on Shri Ramjanm Bhumi path(ADAFBW0001139)
Construction work of Chowpatty near Ram Ki Paidi.(ADACWO0001150)
CC road, drain and street light work in JB Puram Colony.(ADACRD0001153)
Construction work of road and drain in Shankargarh area in Ayodhya.(ADACWO0001154)
Work of sewer, water line etc. in Vashishtha Kunj Yojana.(ADAWOS0001155)
Work of installing Ayodhya logo at various places in Ayodhya.(ADAWOI0001156)
Decorative hanging bamboo light work in Ayodhya.(ADADHB0001157)
Work of installing LED strip lights to illuminate the facade in Ayodhya.(ADAWOI0001158)
Work of installing outdoor decorative multicolored neon lights in various shapes in Ayodhya.(ADAWOI0001159)
Construction work of entrance gate on Dharampath in Ayodhya.(ADACWO0001160)
Construction work of entry gate at Sahadatganj in Ayodhya.(ADACWO0001161)
Supply and installation of outdoor multicolored neon lights in various artistic shapes in Ayodhya.(ADASAI0001162)
Illumination work on major roads of Ayodhya.(Roshni City Illumination SITC)(ADAIWO0001163)
Work of supply and installation of illuminated dandelion poles in Ayodhya.(ADAWOS0001164)
Work of installing Gobo projector lights in Ayodhya.(ADAWOI0001165)
Installation work of butterfly metal tree statue in Ayodhya.(ADAIWO0001166)
Work of laser cut aluminized artistic SITC in Ayodhya (Hybycozo)(ADAWOL0001167)
Work of making murals using cobble-pabble on the walls along the major roads of Ayodhya.(ADAWOM0001168)
Work of making murals made of GRC on the walls along the main roads of Ayodhya.(ADAWOM0001169)
Work of making murals using terracotta fine soil on the boundary walls of the main roads of Ayodhya.(ADAWOM0001171)
Painting of ceramic murals on walls along major roads of Ayodhya.(ADAPOC0001172)
Work of making mosaic art on the walls along the main roads of Ayodhya.(ADAWOM0001173)
CNC on the walls along the main roads of Ayodhya. Making cut metal murals.(ADACOT0001174)
Maintenance work along with supply and planting of seasonal flowering plants in Ayodhya.(ADAMWA0001175)
Work of installing concrete planters on four major roads of Ayodhya.(ADAWOI0001176)
Work of supply, installation, testing and commissioning of Shri Ram Stambh at 25 places along the major roads in Ayodhya.(ADAWOS0001177)
Work of installing Ayodhya logo on electric poles at various places in Ayodhya.(ADAWOI0001178)
Work of supply and installation of Ayodhya's symbolic symbol (logo) for selection of agency under Rampath Frontage Development Project in Ayodhya district.(ADAWOS0001179)
Work of installing iron manual drop boom barriers at various places on Rampath and Bhaktipath of Ayodhya.(ADAWOI0001180)
Work of supply and installation of architectural lights under the development project by Fasad near Rampath in Ayodhya.(ADAWOS0001181)
Construction work of Rajdwar Park stairs and ramp on Bhaktipath.(ADACWO0001182)
The work of appointing an agency for flower decoration on the main roads of Ayodhya.(ADATWO0001183)
Firozpur Upahar Tehsil- Construction work of boundary wall and gate in Sohawal, Vashishtha Kunj scheme.(ADAFUT0001184)
Beautification work in front of the airport gate on Naka bypass.(ADABWI0001185)
For the convenience of the devotees in Ayodhya, the work of a stand to keep their belongings organized.(ADAFTC0001186)
Barricading work for the visitors to visit Ayodhya in a protective manner.(ADABWF0001187)
Barricading work for the visitors to visit Ayodhya in a protective manner. (Part-2)(ADABWF0001188)
Barricading work for the visitors to visit Ayodhya in a protective manner. (Part 3)(ADABWF0001189)
Barricading work for the visitors to visit Ayodhya in a protective manner. (Part 4)(ADABWF0001190)
Construction work of parking near Gurukul Sanskrit Mahavidyalaya in Ayodhya.(ADACWO0001191)
Construction work of parking near the power house in front of Ramkatha Park in Ayodhya.(ADACWO0001192)
Road construction work next to Fatikshila in Ayodhya.(ADARCW0001193)
Construction work of a new access road for the tent city to be built in Nav Ayodhya from the national highway.(ADACWO0001194)
Work of strengthening of pre-built roads for the access road of the tent city under construction in Navya Ayodhya (Green Field Township).(ADAWOS0001195)
In view of the arrival of Honorable Prime Minister, work of cleaning and painting of crash barrier on NH 27 from Sahadatganj to Ayodhya bridge and washing of trees/plants, lifting of debris and planting of seasonal saplings between the dividers.(ADAIVO0001196)
Integrated Traffic Management System (Smart and Safe City Project)(AMCITM00034)
RFP for Door to Door MSW Collection & Transportation, Mechanical Sweeping of Roads and Mechanised Cleaning of Toilet Services in Selected Areas of Ayodhya(AMCRFD00037)
Animal Birth Control (Controlling breeding of dogs)(AMCABC00061)
Kanha Gaushala(AMCKAG00062)
Development of Rajdwar Park(AMCDOR00064)
Reclaimation of Legacy Waste through Scientific Ways at Sita Lake behind Parikrama Marg(AMCROL000109)
Construction of Five Drains at different Locations under Municipal Coporation of Ayodhya to maintain Drainage System(AMCCOF000263)
Construction of Bituminous Road and Drain in Shamshudeen Pur from Mirzapur Maafi Road to Chandrika Yadav House(AMCCOB000264)
Construction of Bituminous Road and Drain in Makkhapur from Bypass to Primary School (AMCCOB000265)
Construction of Bituminous Road and Drain in Shamshudeen Pur from Primary School to Sainik Poster Kids Pre School(AMCCOB000266)
Construction of Bituminous Road and Drain in Mirzapur Maafi from Panchayat Ghar to Chhedi Lal Rawat House (AMCCOB000267)
Construction of Bituminous Road and Drain in Kushmaha from Akbarpur Main Road to Rajendra Prasad House(AMCCOB000268)
Construction of CC Road and Drain in Kushmanaha from Panchayat Ghar to Achari Ka Purwa Kali Mata Main Road(AMCCOC000269)
Construction Of Interlocking Road and Drain in Ranopali from Umesh kumar Verma house to Manendra pratap Singh house to Ram Surat Gupta house(AMCCOI000270)
Construction of CC Road and Drain In Ranopali from Maurya General Store to Ashish Kumar Srivastava House(AMCCOC000271)
Construction of CC Road and Drain in Dharampur Sahadat from Ram Surat House to Ram Ashish House(AMCCOC000272)
Construction of CC Road and Drain in Paliya Sahbadi from Badi Nahar to Vijay Pandey House upto Chhoti Nahar and Adjoining Gaalis(AMCCOC000276)
Construction of Bituminous Road and Drain from Abbusaray bypass to Heerala Yadav House upto Railway Crossing(AMCCOB000279)
Construction of Bituminous Road from Indane Gas Agency Gaddopur to Paliya Shahbadi Samparg Marg (AMCCOB000281)
Construction of Bituminous Road and Drain from Gopalpur Sharda Sahayak Canal to Gopalpur Sampark Marg (AMCCOB000283)
Construction of Bituminous Road and Drain in Gaanja Village from Puliya to Dharamshala (AMCCOB000286)
Construction of Bituminous Road and Drain in Nandapur Village from Shri Vijay Yadav's Shop to Shri R.N. Pandey's House(AMCCOB000287)
Construction of Bituminous Road and Drain in Malikpur from Bade Nahar Ki Puliya to Handpump(AMCCOB000289)
Construction of Bituminous Road and Drain in Kaadipur from Kaadipur Chauraha to Bade Nahar Ki Puliya (AMCCOB000290)
Construction of Bituminous Road and Drain in Gopalpur from Mukhyamarg to Mathura Prasad House(AMCCOB000291)
Construction of Bituminous Road and Drain in Poore Hussain Khan from Shri Asgar's Shop to Shri Sanjay's House(AMCCOB000292)
Construction of Bituminous Road and Drain in Ranopali from Bihari Ke Purwa Joganiya Parikrama Marg to Shri Chand's House and Adjoining Gali (AMCCOB000293)
Construction Of Interlocking Road and Drain in Ranaopali from Vaishnavi Nursing Home bypass to Mahobra Bazaar and Adjoining Galiya(AMCCOI000294)
Development of work of thirty three parks of ayodhya(AMCDOW000331)
Construction of Roads and Drains in 359 streets of Ayodhya(AMCCOR000347)
Reclaimation of Legacy Waste through Scientific Ways at Sita Lake behind Parikrama Marg Phase-2(AMCROL0001140)
Construction of Transit Hostel and Police Barracks, Ayodhya(C&DCOT0008)
Crematorium (Mukti Dham)(C&DC(D00036)
Solid Waste Treatment Plant (C&DSWT00063)
Dr. Bhimrao Ambedkar International Sports Complex(C&DDBA00069)
Construction of Multi Level Parking Near Collectorate Office, Ayodhya(C&DCOM000145)
Cultural Stage(C&DCUS000150)
Government Inter College- Dadera(C&DGIC000151)
ITI Building, Movai(C&DIBM000152)
24 Court Building, District Court, Faizabad(C&D2CB000155)
Construction of Office Building of Ayodhya Municipal Corporation(C&DCOO000262)
Construction of a shelter home for 300 persons under the 'Shelter Scheme for Urban Homeless', a component of the National Urban Livelihood Mission, near Awadh Bus Stand in Ayodhya district (C&DCOA0001145)
Construction work of Kalyan Mandap in the newly created Municipal Corporation Naka Bypass Rae Bareli Road (extended limit) under the Chief Minister City Creation Scheme (C&DCWO0001146)
Work of Zonal Office/Zonal Urban Facilitation Center (Zonal Urban Facilitation Center) under the State Smart City Scheme at Asifbagh in Municipal Corporation, Ayodhya (C&DWOZ0001147)
Construction work of administrative building/integrated control room on 12000 square feet land of Police Department located outside Shri Ram Janmabhoomi Teerth area Ayodhya(C&DCWO0001148)
Development of Ayodhya as Exclusive Solar City(DOADOA000366)
Construction of Ayodhya Development Authority and Ayodhya Municipal Corporation office building(DOHCOA0001151)
Construction of Ayodhya Barrage Work over Saryu River(I&WCOA000147)
Strengthening and Development of Irrigation Department Rest House Near Nayaghat(I&WSAD000314)
Project of Tourism Development / Beautification near the Samadhi Site Complex of Mahant Paramhans Raj Chandradas Ji of District Ayodhya(I&WPOT00054)
Project for Development and Construction of Guptarghat (Length 800 Metres)(I&WPFD000241)
Ram Ki Paidi Remodeling (Part-B Remodeling of Channel) (I&WRKP000242)
Construction of dam on right bank of Ghagra (Saryu) River from Guptar Ghat to Jamthra Ghat (1.15 km) and revival of Harishchand Udaya Dam from 0.00km to 3.90km in District Ayodhya(I&WCOD000338)
Ayodhya Railway Station Redevelopment Projects(MRLARS0001)
Improvement and Upgradation of 84 Kosi Parikrama Marg (NH-227 B) Package - 4&6(NDPIAU000367)
Improvement and Upgradation of 84 Kosi Parikrama Marg (NH-227 B) Package-5(NDPIAU000368)
Beautification of Ayodhya Bypass (NHABOA00074)
Ayodhya Ring Road(NHAARR000113)
NH 330-A Jagdishpur Ayodhya Project(NHAN3J000249)
Improvement and Upgradation of Chaurasi Kosi Parikrama Marg (NH 227 B) Package - 1,2&3(NHDIAU000117)
Maryada Purushottam Shri Ram International Airport(RDMPS00029)
Dr. Brij Kishor Medical College, Devkali Ayodhya(USCDBK00071)
Construction and Renovation of Tulsi Samarak Bhawan under Ayodhya Shodh Sanstha Scheme(USCCAR00097)
Construction of Residential Blocks at Sri Ram Hospital, Ayodhya(USCCOR000144)
Construction work of Food and Drug Laboratory and Divisional Office Building in Ayodhya(USCCWO000349)
Construction of district drug warehouse in district ayodhya(UPHCOD000365)
ITI Ayodhya(UPHITA0001007)
Repair and Renovation of Hostel block and Dining Room at Govt. I.T.I Ayodhya District-Ayodhya(UPHRAR0001197)
Construction of Building in Government Mahila Polytechnic Ayodhya as per A.I.C.T.E Standards District Ayodhya(UPHCOB0001198)
Construction of Community Health Centre, Sunwa(UPHCOC00081)
Greenfield Township(UPHGRT000108)
Rajkiya Mahavidyalaya, Bikapur, District Ayodhya(UPHRMB000114)
ITI Milkipur(UPHITM000245)
ITI Sohawal(UPHITS000246)
Ayodhya Sewerage Reorganisation Plan (Ayodhya City, Tehsil Sadar)(UPJASR00035)
Ayodhya Sewerage Scheme Phase-2(UPJASS00043)
Sewer Connection Scheme Phase-2 of Ayodhya Nagar(UPJSCS00044)
Construction of Co-treatment Plant in Ayodhya Nagar(UPJCOC00048)
Faecal Sludge Treatment Plant (32 KLD)(UPJFST00053)
Sewerage System-Faizabad City Sewerage Scheme, District-1 Part-1(UPJSSC00065)
Drinking Water System, Nagar Nigam Ayodhya Water Supply Scheme Phase - 3(UPJDWS00066)
Capacity Expansion Work of Additional 6 MLD STP in 12MLD STP Installed Earlier at Ramghat Ayodhya(UPJCEW000252)
Treatment of 15 Drains of Ayodhya Cantt through Bio Remediation Process(UPJTO1000337)
Water Treatment Plant Scheme Phase-1 from Saryu River Water Supply Source(UPJWTP000350)
24x7 Water Supply Scheme in six wards of Municipal Corporation Ayodhya(UPJ2WS000351)
Interception and diversion plan of Nirmalikund drain under Ayodhya Cantt area(UPJIAD000352)
Drinking water scheme of extended area of Municipal Corporation Ayodhya(UPJDWS000353)
Municipal Corporation Ayodhya Sewerage Scheme District-1 Part-2(UPJMCA000354)
Sewerage plan phase-1 for the extended area of Municipal Corporation Ayodhya(UPJSPP000355)
Interception and Diversion of Drains of Faizabad City(UPJIAD00042)
Solar City Project(UPNSCP000101)
Construction Work of Hostel for Thirty Two Women Personnel in Police Line in Ayodhya District(UPPCWO000243)
Construction work of Hostel/Barrack for 100 Men in Police Line in Ayodhya District (G+6)(UPPCWO000244)
Construction work of House/Office Building ,Servant Quarter, Garrage and Staff Quarters for Milkipur Jurisdiction Officer under Category1 (6 Nos) and Category-2 (1 Nos)(UPPCWO000254)
Work to Underground the Balance Open Cables(UPPWTU000156)
Construction of 220 KV Sub-Station Ayodhya and Related 220 KV and 132 KV Lines.(UPPCO200017)
The Work of Strengthening the Central Plan District Education and Training Institute, Ayodhya(UPPTWO00014)
Tourism Development for Kamakhya Devi, Rudauli(UPPTDF00018)
Tourism Development for Hathi Ram Baba Temple, Gosaiganj(UPPTDF00019)
Tourism Development for Ashtabhuja Durga Temple Ayodhya(UPPTDF00020)
Tourism Development for Gauraiya Devi Temple, Bikapur(UPPTDF00024)
Tourism Development for Sidhnath Dham, Milkipur(UPPTDF00025)
Construction of Community Toilets in Faizabad Acharya Narendra Deva ward, Dalmandi Ward, Amaniganj Ward Area, Avadhpuri Ward, Pathan Tolia Area, Jharkhandi Ward, Mangal Pandey Ward Area.(UPPCOC00049)
Tourism Development Work in Hanuman Kund, District Ayodhya(UPPTDW000255)
Tourism Development Work in Swarnkhani Kund, District Ayodhya(UPPTDW000256)
Tourism Development Work in Ganesh Kund, District Ayodhya(UPPTDW000257)
Beautification work of Guptar Ghat - Phase 3(UPPBWO000357)
Construction Work of Sitting Hall for 60 to 70 Persons and Twenty Suite Inspection Room in Old Postal Bungalow Complex, situated along NH-28 in District Ayodhya(UPPCWO00099)
Construction of Atal Residential School(UPPCOA000100)
Strengthening of the Official Residence of District Magistrate Ayodhya in Ayodhya District(UPPSOT00055)
Construction of Rooms on First Floor of Annexe Bhawan at Circuit House Complex in District Ayodhya(UPPCOR00098)
Janm Bhoomi Path( Sugriv Kila to Shri Ram Janm Bhoomi Mandir Marg)(UPPJBP000102)
Bhakti Path (Shringar Haat to Shri Ram Janm Bhoomi Mandir Marg)(UPPBP(000107)
Construction, Development and Road Widening work of Panch Kosi Parikrama Marg(UPPCDA0001141)
Construction work of the link road (length 0.205 km) from km 11 of Sahadatganj Nayaghat road in Ayodhya district, next to Shri Ram Hospital, to Sugriva Kila(UPPCWO0001142)
Construction work of road from Bhaktipath to Shri Ram Janmabhoomi Path via Hanumangarhi road in Ayodhya district (length 0.290 km).(UPPCWO0001143)
Construction work of road (length 0.225 km) from Bhaktipath to Shri Ram Janmabhoomi Path via Ram Gulela(UPPCWO0001144)
Tourism Development of Block Tarun, Thariyakala Bishun Baba Site of Ayodhya District.(UPPTDO00039)
Tourism Development of Shringirishi Ashram in Maya, Development Block of Gosaiganj, District Ayodhya(UPPTDO00040)
Construction of Four-Lane Road from Ayodhya Sultanpur National Highway (NH-330) to Airport(UPPCOF00045)
Construction of Four Lane Road from NH-27 Bypass to Tedhi Bazar Ram Janambhoomi via Mahobra Market in District Ayodha(UPPCOF00046)
Strengthening of Road from Booth Number Four to Hanuman Gufa via Ramghat Chauraha(UPPSOR00047)
Widening and Strengthening of Ayodhya Bilhar Ghat Bandha Road (UPPWAS00050)
Work of Strenghthening of Asharfi Bhawan Golaghat Road to Tulsi Udyan Road in District Ayodhya(UPPWOS00083)
Construction from Panch Kosi Parikrama Marg Km-11 (Near to Rajghat Park) to Jhunki Ghat Road in Ayodhya (UPPCFP00084)
Widening and Strengthening of Dharshannagar to Bharat Kund Road(UPPWAS00085)
Widening and Strengthening Work on Ranopali Railway Crossing to Vidyakund Road in District-Ayodhya.(UPPWAS00086)
Strengthening of Road fromTedhi Bazar to Post Office via Asharfi Bhawan in District Ayodhya(UPPSOR00087)
Strengthening of Panch Kosi Parikrama Road from Udaya Chauraha to Golaghat in District Ayodhya(UPPSOP00088)
Construction of Asharfi Bhawan to International Media Center (Press Club) Road in District Ayodhya(UPPCOA00089)
Widening and Strengthening from Tedhi Bazar Ashrafi Bhawan Road to Rajghat in District Ayodhya(UPPWAS00090)
Widening and Strengthening from Golaghat Chauraha to Laxmankila Ghat Road in District Ayodhya(UPPWAS00091)
Widening and Strengthening Work from Ashrafi Bhawan Golaghat Road to Jhunki Ghat Road in District Ayodhya(UPPWAS00092)
Widening, Strengthening and Beautification Work of Nayaghat Chauraha(UPPWSA00093)
Widening and Strengthening of NH-27, Ayodhya Faizabad Main Road via Ramghat Digambar Akhara in District Ayodhya.(UPPWAS00094)
Construction of Two Lane with Paved Shoulder Road for Government Allopathic Medical College Ayodhya(UPPCOT00095)
Panch Kosi Parikrama Marg(UPPPKP000104)
Chaudah Kosi Parikrama Marg(UPPCKP000105)
Dharam Path (Bypass Road to Nayaghat)(UPPDP(000247)
Construction/Re-construction of Proposed Gosaiganj Four Lane Bypass on Ayodhya-Akbarpur-Baskhari Bypass(UPPCOP000258)
Construction/Re-construction of Proposed Mayabazar Four Lane Bypass on Ayodhya-Akbarpur-Baskhari Bypass(UPPCOP000259)
Widening and Strengthening Four Lane Road of Bahraich Faizabad Azamgarh (SH-30) in Ayodhya(UPPWAS000315)
Construction work of computer room and seminar hall in Government Polytechnic Ayodhya(UPPCWO0001132)
Ram Path ( Sahadatganj to Nayaghat )(UPPRP(000260)
International Ram Katha Museum and Art Gallery(UPRIRK00028)
Facade Light Electrification Work at Dashrath Bhawan, Kanak Bhawan, Janki Temple, Digambar Akhada and Raj Dwar Mandir in Ayodhya District(UPRFLE00067)
Sound System Work in Bhajan Sandhya Location(UPRSSW000146)
Yatri Niwas at Ayodhya Dashrath Mahal, Satsang Bhawan, Tourist Assistance Center at Naya Ghat and Construction of Entrance.(UPRYNA00031)
Construction Work of Queen Ho Memorial Park, Ayodhya(UPRCWO00073)
Transit Hostel at Police Line-Ayodhya G+12 (2 Blocks)(UPRTHA000106)
Rajarshi Dashrath Autonomous Medical College Ayodhya. (UPRRDA0005)
Fire Station (NR) Building Rudauli Ayodhya(UPRFS(0007)
Tourist Work Ramayan Circuit Ayodhya(UPRTWR00016)
Government Inter College Milkipur Ayodhya(UPRGIC00021)
Ayodhya Dham Bus Station (Phase 1)(UPRADB00075)
100 Bed Hospital Kumarganj District Ayodhya(UPR1BH00076)
50 Bed Hospital Devgaon Milkipur Ayodhya(UPR5BH00077)
Driving Training Institute Ayodhya(UPRDTI00082)
Government Degree College Parsawan Ayodhya(UPRGDC000141)
Navin Rajkiya High School, Ghodawal(UPRNRH00041)
Dr. Brij Kishore Homoeopathic Medical College and Hospital(UPRDBK00070)
Construction of Mini Stadium in Kodai Kalan Gaon(UPRCOM00072)
Navin Rajkiya High School, Baharas(UPRNRH000143)
Construction work of 60 seated women's hostel in Government Polytechnic Ayodhya(UPRCWO0001131)
Construction of Rail Overhead Bridge at Faizabad-Akbarpur Marg, Crossing No. 118A (Fatehganj)(UPSCOR0002)
Construction of Lane Rail Overhead Bridge at District Ayodhya Railway Division Jaffrabad-Faizabad-Lucknow in the West Yard of Faizabad Station Rail Located at KM 968/02-03 Four on Sampark No. 121 B (Modaha)(UPSCOL0009)
Construction of Railway Over Bridge at Crossing N. 108AC Suryakund at Rail Section Lucknow-Ayodhya in District Ayodhya(UPSCOR00010)
Construction of Fly Over & Rail Over Bridge at L-Crossing No. 111-B on NH-27 to Mahobra via Tedhi Bazar Link Road District Ayodhya(UPSCOF00011)
Construction of Railway Over Bridge (Akbarpur SH-30) at X-ing No. 107A/2T Varanasi-Faizabad Rail Section At Deokali on Ayodhya-Varanasi Road in District Ayodhya(UPSCOR00012)
Construction of Railway Over Bridge at Chaudah Kosi Parikrama Marg Crossing No. 105 Suryakund at Rail Section Lucknow-Ayodhya in District Ayodhya(UPSCOR00013)
Construction of Fly-over & R.O.B. At L-Xing No. 112 Atram Ghat in Distt Ayodhya(UPSCOF000248)
Ayodhya Dham Bus Station (Phase-2)(UPSADB000169)
Tourist Facilitation Centre(UPTTFC00030)
Shri Ramayana Cruise - From Guptar Ghat to Ram Ki Paidi(UPTSRC00052)
Development and Upgradation of Thirty Seven Pilgrimage Sites Located in Ayodhya under the Prasad Scheme of Ministry of Tourism, Government of India(UPTDAU00057)
Riverfront Development of Nine Kms on the Banks of River Saryu in Ayodhya under Swadesh Darshan Ramayana Circuit Scheme of Ministry of Tourism, Government of India.(UPTRDO00059)
×
Home
Dashboard (Priority Projects)
Portfolio
Back
Project Count -
Project Value -
Cr
No Category Found..